基于多重相关状态采样的多元EWMA控制图
更新日期:2021-05-25     浏览次数:135
核心提示:摘要为提高控制图的监测效率,提出了一种基于多重相关状态采样的多元EWMA控制图,并利用改进后的马尔可夫链方法计算控制图的平均运行长度。根据不同参数

摘要 为提高控制图的监测效率,提出了一种基于多重相关状态采样的多元EWMA控制图,并利用改进后的马尔可夫链方法计算控制图的平均运行长度。根据不同参数下控制图的平均运行长度,分析了控制图在失控和受控状态下的性能表现,并与其它多元EWMA控制图进行比较。模拟结果表明,该控制图具有良好的监测能力。最后用一组模拟数据来说明该方法的使用。 To improve the efficiency of control chart,a new multivariate EWMA control chart has been developed using multiple dependent state sampling.The parameter of the proposed control chart as well as the average run length has been evaluated for different process settings using an improved Markov chain model.The proposed control chart has been evaluated using the average run length of the in-control and out-of-control process.The comparison of performance of the proposed and existing control chart has been studied.It has been shown that the proposed control chart using MDS sampling is more sensitive than the existing control chart.A simulated data is used to illustrate the procedure of the proposed control chart.
作者 刘欣怡 朱永忠 LIU Xin-yi;ZHU Yong-zhong(School of Science,Hohai University,Nanjing,Jiangsu 211100,China)
机构地区 河海大学理学院
出处 《计算技术与自动化》 2021年第1期68-72,共5页 Computing Technology and Automation
关键词 多重相关状态采样 多元EWMA控制图 平均运行长度 马尔可夫链 multiple dependent state sampling multivariate EWMA control chart average run length Markov chain model