关于提前开展变电站土建施工图设计的研究
摘要:土建工作在变电建设过程中非常重要,但是土建图纸的设计受设备招标滞后的影响,文章论证了依据假设厂家资料提前开展土建施工图设计的可行性,总结了提前开展设计工作的风险和不足。从设计角度给出了提前开展不受设备招标影响的土建图纸设计工作的建议。
Abstract: the civil work is very important in the process of substation construction, but the design of civil engineering drawings affected by equipment tendering lag, the article demonstrates the basis assumptions manufacturer information in advance to carry out the feasibility of civil construction drawing design, summarized the advance in design work of risk and the insufficiency. From the design Angle is given in advance is not affected by equipment tendering of construction drawing design work.
关键词:变电站;土建图纸;进度;设备招标